Ocean Park Redevelopment Contract CI05 – Funicular Tunnel and Termini
We designed, manufactured and installed 33 no. cross passage sliding doors in this funicular tunnel project. The sliding door has a clear opening width of 1200mm and with specified closing speed of 40mm per second. We also provided standard timber and steel doors in the Waterfront and Summit Termini.
 