HSBC Data Centre Project at Tseung Kwan O
We supplied and installed bomb-blast doors, extra heavy duty steel doors as well as standard fire rated steel doors to this prestigious project. All the steel doors were robustly constructed to defend the building perimeter. Finish of standard steel doors is PVF2 fluorocarbon coating for colour consistence under prolonged exposure to sunlight.
We also installed an oversized bomb-blast sliding door which weights over 4 tons. The sliding door is manually operated and gives a clear opening size of 4m x 4m when fully opened.
 